Electrical testing and acceptance
Protection system testing and acceptance testing of LV/MV/HV installations and equipment, with owned, calibrated test equipment.
COM.EN.CO. Energy
An untested protection is a protection you cannot trust
Relays, switchgear and transformers have to be proven before they are energised and after every modification. We test them to the client's specifications and the applicable CEI standards, and deliver complete test records.
Protection relay testing, acceptance testing of LV/MV/HV installations and switchgear at the works (FAT) or on site (SAT), and commissioning of substations through to first energisation.
PES/PAV qualified personnel (CEI 11-27) using owned, calibrated test equipment, with test reports for every check performed.
Protections verified, installations ready for energisation.
Complete test records and certificates, available to the client, including for inspections by the competent bodies.
Activities
- Protection relay testing by secondary injection
- Acceptance testing of LV/MV/HV installations
- Switchgear FAT and SAT
- CT/VT and power transformer tests
- Insulation resistance and withstand voltage tests
- Commissioning of HV/MV substations and first energisation
- Test reports and records
Systems and equipment
- LV switchgear (CEI EN 61439)
- MV switchgear (CEI EN 62271-200)
- Protection relays and interlocks
- Instrument transformers (CT/VT)
- Power transformers
- HV/MV substations and transformer rooms
Who we deploy
- LV/MV/HV test engineers
- Electricians, PES/PAV qualified (CEI 11-27)
Group companies involved
Electrical installations and testing
References available on request
We work at third-party plants under confidentiality agreements with our clients. Detailed references for supplier qualification and tenders are available on request.
See recent work →From enquiry to energisation
Assessment
Plant, equipment, scope, schedule and site constraints.
Specialist selection
Specialists chosen on experience with that type of installation and on references.
Safety and logistics
Site risk assessment, travel, site access and safety documentation: handled by head office.
Head-office support
Field teams backed by head-office engineers for the whole duration of the job.
Testing on the schedule?
State the plant, the equipment and the type of test: the request goes straight to the right company.