Field experience, with full confidentiality
A selection of work recently carried out by the group companies. We operate at third-party plants under confidentiality agreements with our clients: for this reason we do not disclose sites or project data.
Commissioning of compression and power generation modules for LNG plants
Electrical and instrumentation pre-commissioning and commissioning of skid-mounted modules with turbocompressors and turbogenerators, at the assembly yard, before shipment to site.
- Mechanical and electrical completion checks of the modules
- Loop checks and functional tests of switchboards, MCCs and instrumentation
- Control system and machine protection tests
- Punch list close-out and handover documentation
Operation of power generation plants
Operation of gas turbine power plants at several sites, 24/7 where required, in the control room and in the field, in coordination with the client's operating staff and in compliance with site procedures.
- Start-up and shutdown sequences, synchronisation, load control and load sharing
- Continuous monitoring of temperatures, pressures and vibrations, first-line alarm management
- Field inspections with recording of anomalies
- Operating log and periodic reports on running hours, starts and availability
Gas turbine hot gas path replacement
Hot gas path inspection and replacement of hot section components, within the plant's scheduled outage window, to the manufacturer's instructions and the client's maintenance plan.
- Unit isolation, disassembly and as-found recording
- Visual and borescope inspection of combustion chambers, transition pieces, nozzles, blades and vanes
- Reassembly with radial and axial clearance, run-out and torque checks
- Alignment check and start-up support, with final as-left report
Commissioning of HV/MV substations
From preliminary checks and cold tests through to first energisation, to client specifications and CEI standards, by PES/PAV qualified personnel (CEI 11-27).
- As-built verification against single-line, functional and wiring diagrams
- CT/VT tests and protection relay testing by secondary injection
- Circuit breaker and disconnector tests, local and remote
- Power transformer tests and support during first energisation
Acceptance testing of switchgear
Acceptance testing of LV and MV switchgear at the manufacturer's works (FAT) or on site (SAT), to client specifications and CEI EN 61439 / CEI EN 62271-200.
- Visual inspection and construction checks against drawings and rating plates
- Insulation resistance and power-frequency withstand voltage tests
- Mechanical operation tests of switching devices and interlocks
- Protection tests by secondary injection, with test reports